Sports Facilities · 2023
Equestrian Center
Drainage and circulation upgrades for an equestrian facility using calibrated pozzolan layers to reduce muddy areas and improve year-round usability.

Location
Clermont-Ferrand
Duration
5 weeks
Project Scope
Rehabilitation of circulation paths, paddock surroundings, and access zones to maintain usability during wet periods.
Technical Details
Combined 20/50 mm deep drainage layer with 5/20 mm surface profile, slope reprofiling, and side drainage channels.
Outcome
Clear reduction of standing water and safer movement conditions for horses, riders, and maintenance teams.
Key Highlights
- • Treated circulation length: 640 lm
- • Dual grading: 20/50 mm + 5/20 mm
- • Site remained operational throughout work
Related projects

2024
Contemporary Garden
Complete landscaping project using red volcanic pozzolan mulch to structure planting zones, reduce evaporation, and limit weed growth while keeping a clean visual identity.
Discover project

2024
Green Roof
Installation of a pozzolan-based drainage layer for a green roof in an urban context, improving water flow regulation and long-term substrate stability.
Discover project

2023
Filtration Plant
Use of volcanic pozzolan as natural filtration media in a local treatment facility to improve filtration consistency and simplify maintenance cycles.
Discover project